1. Project snapshot
Nearly a century ago, Century Electric bought this Midtown site and built one of the three largest manufacturing operations in St. Louis. The Wabash Railroad line cut right across the property, and Midtown served as the city’s manufacturing hub. The plant’s motors and generators shipped around the world and helped spark the rise of small household appliances.
Owners and products changed over the decades, but the work never really stopped. The foundry ran nearly around the clock until 2007, then went quiet.
2. Project overview
The redevelopment vision called for something the buildings had never been: a mixed-use destination where office tenants, makers, and merchants would share 350,000 SF of historic structure across a 15-acre site. Plans included St. Louis’s first true food hall, alongside shops, entertainment, and creative office space.
The location made the case. City Foundry STL sits along I-64, one of the region’s busiest highways, between the Grand Center arts district and the Cortex Innovation District, where our team also leads leasing. Midtown was turning from a place people drove past into a place they stopped.
The history shaped the design, too. The project relied on historic tax credits, so the developer dropped early plans for taller towers to protect that eligibility and kept the foundry’s character intact.
3. Asset Context & Challenge
Adaptive reuse at this scale carries a specific bind. The developer held an asset with real architectural distinction and no income attached to it, and the financing package hinged on signed office leases before construction could begin.
That created four constraints at once:
- No in-place income. Every dollar of value sat in the future, so tenants had to commit to a building they could only see on paper.
- Financing gated on leasing. The lender needed executed office leases to underwrite the deal, so the leasing schedule set the construction schedule.
- Suburban rents in the city. City Foundry’s office space asked rents typically seen in Clayton and Chesterfield but rarely in the city. Tenants had to believe Midtown was worth it.
- No operational precedent. A first-of-its-kind mixed-use complex had no playbook for onboarding tenants or running the buildings day to day.
4. Our team’s role
Our team served as the single point of accountability across leasing strategy, tenant negotiations, facility operations, stakeholder alignment, and implementation oversight.
- Office pre-leasing strategy and execution
- Tenant negotiations through lease signature
- A property management operating model, built before opening day
- Tenant onboarding, building operations, and vendor protocols
- Ongoing day-to-day management of the asset
6. Strategy & execution
Office pre-leasing on an unbuilt asset fails when it gets pitched as a delivery timeline. Prospective tenants hear a construction schedule and wait for proof. We led instead with what the finished complex would become and who else would be in it.
We targeted companies for whom a Midtown address was an advantage, not a compromise: organizations that wanted to recruit talent, sit near Cortex and Grand Center, and work inside a building with a story. The tenant mix that signed showed the range, from a digital publisher to a DNA technology company to a regional public agency. Two of those leases alone covered 30,000 SF and nearly 100 employees. We converted early interest into signed leases on a schedule the lender could underwrite.
The operating model ran on a separate track. Rather than opening the doors and solving problems as they surfaced, we wrote the playbook first:
- A tenant onboarding process, documented before the first move-in
- Building operations standards and preventive maintenance programs
- Vendor selection, scopes, and performance expectations
- Tenant communication protocols
6. Results
The office space reached 100% leased before construction began, giving the developer the signed leases its financing required. With financing in place, the project moved into construction, and our team had the operating model ready before tenants arrived.
After opening, our team led day-to-day property management, turning a dormant foundry into a working address for companies, makers, and merchants. Today, LCG keeps one of its own offices at City Foundry STL. We still work inside the building we helped bring back.